Dermody
Louisville, KYThis particular tilt wall building had to be constructed on a 5’ slope due to unique site conditions. The foundations, slab-on-grade, and tilt wall construction were completed in less than two months. The site conditions would normally double the duration of a project for most construction teams. Our teams not only met the time requirements, but exceeded the floor flatness specifications and tilt wall tolerances for the project.
Project Specifications
- 546,000 SF
- $4,000,000 Budget
- Tilt Wall with 5′ Slope due to Site Conditions