New Cut

Louisville, KY

This fast-track facility couldn’t be constructed without the design and construction of tilt wall panels. RA Libs, Inc was tapped to construct this Class A Warehouse space due to the time constraints and the quality required of the facility. We used concrete form liners on the exterior walls to accent the facility. The floors were constructed to FF50 FL35 requirements, which were exceeded. The foundations, slab-on-grade, and tilt wall construction were completed in 45 days, which was well within the construction schedule timeline.


Project Specifications

  • 452,000 SF
  • Tilt Wall Construction with $4,200,000 Budget
  • Concrete Form Liners to Accent Exterior Walls
  • Exceeded FF50 FL35 Requirements
  • Completed Well Ahead of Schedule
7C59B335-1EE3-482A-9E5D-A70C4F612A39 Created with sketchtool. Concrete Foundations C6FF5EBC-BCE6-4D71-895B-3AA42C666F8D Created with sketchtool. Concrete Slab Construction 00210DD7-A0C2-4B87-8F9E-8156D5F10387 Created with sketchtool. Site Development 3E44BDA4-E55C-4543-A6D5-C4D641E64D11 Created with sketchtool. Tilt Wall Construction